• Design
  • Research
  • Consulting
  • About Us
  • Contact
  • Languages
1DL
  • Design
  • Research
  • Consulting
  • About Us
  • Contact
  • Languages
    © Copyright 2015-2021. All Rights Reserved.

    Hangzhou Bay Bridge Nan’an Service Area Design

    Type: Infrastructure
    Area: 42,560 sqm
    Collaborator: ZSAD

    Stage: Competition Entry Top 3

    In re-imagining the future of highway services in China, where the conventional management of toll roads meets new technologies such as ETC and smart city, 1DL proposes to re-engage the service area with the city rather than merely a supporting infrastructure to the highway.

    The proposal spatially flips the relationship between service roads and the main structure by allocating all traffic to the highway side of the service building, creating an intimate boundary between the service building and the city. A shopping mall is introduced as a main feature to functionally bridge the restaurants with visitors from the Ningbo. Smart parking strategy is deployed to manage highway and local traffic with maximum flexibility.

    As an anchor to the Hangzhou Bay Bridge, the architectural design features a conspicuous roofscape, serving both as an apparatus for climate control and an infrastructure to create public space around the building volume in all directions. The interior follows the guidance of the roof ridgelines, providing a coherent interface between the physical environment and its functionality. The design also proposes to re-connect the surface water and wetland systems in the site as both a featured landscape and a rain water/runoff management system.

    Share

    FacebookTwitter XPinterestEmail
    Overall layout of the service area.
    Site plan.
    Entrance from the city side.
    Entrance from the highway parking lot.
    Interior convergence zone.
    Interior shopping mall.
    Interior rest area.
    Roofscape design.
    Section illustrating relationship between public and commercial spaces under the roof.
    Bird eye view during the night.
    Bird eye view illustrating the re-connected water system with wetland in the distance.
    Water system runs through the building to connect the surrounding waterbodies.
    A spatially flipped relationship between the main service building and the parking lots.
    Previous
    Next

      © Copyright 2015-2021. All Rights Reserved.